    From server room to colocation, engineered with precision.

    Once your company has contracted the data center, Lavineda Tecnologia makes the environment happen inside it: architecture, equipment specification, cabling and migration, from your server room to the colocation rack, anywhere in Brazil. Remote hands when someone is needed on site, and 24×7 operations after handover if you want. In English, from the first call.

    Data center planLavineda
    1. Your space in the data center
    2. Designed rackelevation, unit by unit, with room to grow
    3. A and B powertwo circuits, one PDU on each side
    4. Servercable labeled at both ends
    5. Patch panelthrough the rack cable manager
    6. Outside the rack
    7. Meet-me roomwhere the carriers arrive
    8. NetBoxevery device and cable recorded
    In green, a cable from the server to the carrier: through the rack cable manager and the patch panel to the meet-me room, labeled and recorded in NetBox. Power on two circuits, A and B, and reserved space planned in the rack.

    What your company gets.

    An environment that goes live on the agreed date and that anyone can understand later.

    • A migration date in writing

      A written schedule, with installation and cutover windows agreed with the data center, the carriers and your team.

    • Documentation that matches the rack

      Every device, port and cable recorded and labeled. What is on paper is what is in the rack, for anyone who comes after.

    • Space and power well used

      The space and power you contracted at the data center, put to use with a plan: specified equipment, balanced circuits and headroom for the growth your company expects.

    When the conversation starts.

    Brazil is getting more data centers every year. These are the moments when companies call us.

    • Setting up operations in Brazil?

      With your data center space contracted, local engineering that designs, builds and documents the environment, with service in English, proposals in Brazilian reais and Brazilian invoices (Nota Fiscal).

    • Moving from a server room to colocation?

      The data center contract is signed; now the environment has to happen inside it. We design, specify, cable and migrate, from your company's server room to the colocation rack.

    • Expanding or changing data centers?

      More racks, a second site for continuity or a change of provider, with the migration planned in agreed windows.

    • Bringing workloads back from the cloud?

      Some workloads move to colocation, connected to the public cloud over a private link. Our engineering designs the architecture and carries out the move.

    From design to operations.

    What goes into the project, by name. Hire all of it, or only the part you are missing.

    • Environment architecture
    • Equipment specification
    • Capacity planning
    • Rack elevation
    • A and B power feeds
    • Structured cabling and labeling
    • Cross-connects and carriers
    • Rack and stack
    • Network, firewall and servers
    • Server room migration
    • Testing and acceptance
    • Remote hands
    • As-built documentation in NetBox
    • 24×7 operations after handover

    How your rack goes live.

    Five stages, each with a written deliverable. Nothing is installed before your team approves the design.

    1. Survey

      What runs in your server room today, what goes into the rack, how much power it draws, how it grows and which carriers need to reach it, based on the space and power contracted at the data center.

    2. Architecture and specification

      The architecture of the new environment, the specification of each device, the elevation of each rack, power per circuit, and cabling and addressing plans, all recorded before purchase and approved by your team.

    3. Staging

      Equipment received, checked and configured before it goes to the data center, so the installation window is short and predictable.

    4. Installation and migration

      Mounting, cabling, labeling and link activation, and the move of your systems from the server room in agreed windows, tested together with the data center and the carriers.

    5. Acceptance and operations

      You receive the documentation of what was delivered and sign the acceptance. Operations can continue with Lavineda under Cloud Care or Network Care.

    Frequently asked questions.

    The essentials about rack deployment in Brazil, in short answers.

    Who does rack deployment in colocation data centers in Brazil?

    Lavineda Tecnologia, a Brazilian infrastructure engineering company founded in 2002, makes the environment happen inside the data center your company contracted, anywhere in Brazil: architecture, equipment specification, capacity planning, power, cabling, network, servers, migration and acceptance. After handover, operations can continue 24×7, with remote hands when the environment needs someone on site. Service is available in English.

    How do I migrate from a server room to colocation in Brazil?

    Once the data center contract is signed, in stages: a survey of the server room, the architecture and specification of the new environment, equipment staging, installation and cabling in the rack, the move of your systems in agreed windows, and acceptance with the documentation. Lavineda Tecnologia runs every stage, with the plan in writing, a rollback defined before each change and every stage communicated as it happens.

    Is there an IT partner in Brazil for companies arriving from abroad?

    Yes. Lavineda Tecnologia works with companies setting up operations in Brazil: in the data center you contracted, it designs and deploys the racks, network and servers, and can operate the environment afterwards. Service is in English or Portuguese, and the company issues Brazilian invoices (Nota Fiscal).

    Does Lavineda work in any data center?

    Yes. Lavineda Tecnologia works in the data center your company contracted, whatever the provider, and takes care of what happens after the contract: designing, specifying, cabling, migrating and documenting the environment. And if your company has not contracted the space yet, Lavineda has colocation partnerships with Cirion and Algar and can include those options in the proposal.

    Does Lavineda provide remote hands in Brazilian data centers?

    Yes. Remote hands means on-site work on your behalf: swapping a disk, power-cycling a device, checking a cable, installing a new server. Lavineda does this in data centers across Brazil, with every intervention recorded. The service format and response times are set in writing in the proposal.

    What is rack and stack?

    Rack and stack is the physical installation of equipment in the rack: mounting on rails, connecting power, cabling and labeling, until everything is ready to be configured. At Lavineda it is one stage of a project that starts with the architecture and ends with the documentation delivered.

    What do I receive at the end of a rack deployment?

    The elevation of each rack, the power plan, the cabling map with labels, the addressing and a record of every device and connection in NetBox, plus the signed acceptance. It is the documentation that lets anyone understand the environment later.

    How much does rack deployment in colocation cost in Brazil?

    It depends on the number of racks, the equipment and the migration. Scope, quantities and prices go in writing in the proposal, after a free conversation about your scenario.

    Talk to our team.

    A free conversation about your scenario, in English. Scope, quantities and prices then go in writing in the proposal.

    Lavineda Tecnologia, Brasília, Brazil. Brazilian company since 2002, serving data centers across the country.